Project Overview

A hydropower station in China required a 200t/h granite crushing plant for producing aggregates used in dam construction. The project demanded high-quality aggregates with excellent particle shape.

The Challenge

  • High-quality aggregate requirements
  • Hard granite material
  • Strict particle shape specifications
  • Limited site space
  • Environmental concerns

Our Solution

We provided a complete crushing solution including:

  • PE600×900 Jaw Crusher for primary crushing
  • HP200 Cone Crusher for secondary crushing
  • VSI8518 Sand Maker for sand making
  • Vibrating Screens for classification
  • Complete conveyor system

Results

  • 200 t/h production capacity achieved
  • Excellent particle shape
  • 98% product quality pass rate
  • Low operating costs
  • Project completed on schedule